Why not just use power boards?
A stack of appliances on a power board can overload it. The plugs or the power point itself overheat, and that's how fires start. A couple of extra points in the right place is the proper answer.
What we do
- Repairs to existing power points
- Single power points upgraded to doubles
- New power points added where you need them
- Old points swapped for a modern finish
- Power points with USB sockets
- Every new point tested for safety
There are rules in the Australian Standards about where a power point can go. We know them, and we'll walk you through the right spot for each one.
Selling or renovating?
New power points are one of the quickest and cheapest ways to freshen up a room, especially the kitchen. A brushed metal finish in place of yellowed plastic lifts the whole wall.
What does a power point cost?
It's the question we hear most, and it's a bit like ringing a mechanic and asking what it'll cost to fix the car. As a rule of thumb, one power point takes about two hours. We can sometimes estimate over the phone, but it's usually better for everyone if we see the job and quote it properly.
A tip: walk around the house and work out everywhere you want one. It's cheaper to have a few done together than to ring us each time you find another gap.
